Start your projectCommercial projects run to a lease, an opening date and a budget that is already committed. The drawings have to be right first time, and the approvals have to land in the right order.
We work with operators, landlords and fit-out contractors nationwide, and we understand that an extra fortnight in planning is rent you are paying for an empty unit.
Sectors we work in
Retail and shopfronts
New shopfronts, signage and advertisement consent, roller shutters and accessibility upgrades. Shopfronts in conservation areas and on listed buildings need particular care, and most boroughs have adopted shopfront design guidance we work to.
Restaurants, cafés and bars
Change of use, kitchen extract ventilation and odour control, external seating, acoustic separation from flats above, and the plans needed for a premises licence application.
Offices and workplace fit-out
Category A and B fit-outs, space planning, occupancy and means of escape, landlord licence to alter drawings and reinstatement schedules.
Industrial and warehouse
New units, mezzanine floors, loading and yard layouts, and extensions to existing sheds. Mezzanines over 20 square metres generally need building regulations approval and often planning permission.
Healthcare, clinics and gyms
Dental and medical practices, aesthetic clinics, veterinary premises and fitness studios. Layouts have to satisfy both planning and the relevant regulator or inspection body.
Places of worship, nurseries and community use
Change of use applications, capacity and escape strategy, external play space for early years provision.
Use classes and change of use
Since the 2020 reforms, most shops, restaurants, offices, gyms, clinics and light industrial uses sit inside the single Class E. Moving between uses within Class E does not usually require planning permission — but it is not a free pass:
- Conditions on an earlier permission can restrict the use of a specific unit.
- Restrictive covenants and lease terms operate separately from planning.
- Physical works — extract ducts, shopfronts, plant, signage — normally need their own consent.
- Article 4 directions in some boroughs restrict changes out of retail in designated frontages.
Drinking establishments, takeaways, cinemas and live music venues sit outside Class E in the sui generis category, so a change to or from those uses does need an application.
The consents a commercial project usually needs
| Consent | When it applies |
|---|---|
| Planning permission | External alterations, extensions, changes of use outside Class E |
| Advertisement consent | Most illuminated and many non-illuminated signs |
| Listed building consent | Any alteration to a listed building, inside or out |
| Building regulations | Structural work, fire safety, accessibility, services, energy |
| Premises licence | Alcohol, late-night refreshment, regulated entertainment |
| Landlord licence to alter | Almost all leasehold fit-out work |
Fire, access and energy
- Means of escape and compartmentation under Part B, coordinated with a fire engineer where the building is complex.
- Part M and the Equality Act 2010 — level access, accessible WCs, and reasonable adjustments to existing premises.
- MEES. Commercial property generally cannot be let with an EPC rating below E, and the minimum standard is expected to tighten, so fit-out is the right moment to fix it.
- CDM 2015. On projects with more than one contractor, a principal designer must be appointed. We can take that role.
Typical programme
| Stage | Time |
|---|---|
| Site visit and initial advice | Within a week of instruction |
| Survey and concept layout | 1–2 weeks |
| Planning drawings | 48–72 hours after survey |
| Planning decision | 8 weeks for minor applications |
| Building regulations and tender package | 3–6 weeks |
Included as standard
What you get
- Site survey and existing condition drawings
- Use class and planning history assessment
- Test-fit and space planning options
- Planning, advertisement and listed building applications
- Licence to alter drawings for your landlord
- Premises licence plans to the required scale
- Building regulations submission and technical drawings
- Fire strategy and means of escape coordination
- Accessibility review against Part M and the Equality Act
- Specification and tender documentation
- Principal designer duties under CDM 2015
- Contract administration and site inspections
Questions
Common questions
Do I need planning permission to change my unit from a shop to a café?
How quickly can you turn around fit-out drawings?
Can you produce plans for a premises licence?
What is a licence to alter?
Do you act as principal designer under CDM?
Do you work outside London?
Also from us
Related services
Free 20-minute consultation
Ready to see your drawings?
Send us the address and a sentence about what you want to build. We will come back with a fixed fee, a programme and the planning route we would take.