Kingsgate ArchitectsDesign · Planning · Build

Drawings back in 24–72 hours. Measured survey to a full set of existing and proposed drawings — 24–48 hours for a loft or extension, up to 72 hours for larger or more complex schemes.

Start your project

Whether it is one house on a tight infill plot or eight flats above a parade of shops, residential development in London lives or dies on policy: density, unit mix, space standards, daylight, amenity and parking.

We test a site against those policies before you commit, then design the scheme that gets the most out of it.

What we work on

New build houses and infill plots

Backland and garden-land sites, end-of-terrace gaps, and plots created by demolition. We assess access, overlooking, daylight to neighbours and the character of the street before drawing anything.

Flat conversions

Splitting a house into self-contained flats, or converting upper floors above commercial units. Unit sizes, private amenity space, refuse and cycle storage and sound insulation between dwellings all need to meet standards to get through.

HMOs

Houses in multiple occupation, including the change of use from a family house to a small or large HMO. Licensing requirements and Article 4 directions restricting HMO conversions apply in many London boroughs.

Change of use to residential

Offices, shops and light industrial units converted to homes, either through full planning or the Class MA prior approval route. Daylight, noise, contamination and flood risk are the usual hurdles.

Small residential developments

Blocks of up to around 25 units, mews schemes and rooftop additions. These are major or minor applications depending on scale, and normally need a wider consultant team.

The standards your scheme has to meet

  • Nationally Described Space Standard. Minimum gross internal areas by number of bedrooms and bedspaces — 37 sq m for a one-bed one-person flat, 50 sq m for a one-bed two-person flat, and up from there. Adopted by most London boroughs.
  • The London Plan. Housing density, dual aspect, private outdoor space, play space, cycle parking and car-free development in well-connected locations.
  • Part M4(2) accessibility. Most new dwellings must be accessible and adaptable, with a proportion built to wheelchair-user standard M4(3).
  • Biodiversity net gain. A 10% net gain requirement applies to most developments, with limited exemptions for small householder work.
  • Fire safety. A fire statement is required for relevant major developments and any building with residential units above 18m.

Feasibility first

For any site of real value, we recommend a feasibility study before you buy or commit. It sets out how many units the site can realistically carry, the constraints that will shape the scheme, the likely planning route and the consultants you will need. It is a small fraction of the cost of finding out the hard way.

The wider team

Residential schemes above a handful of units usually need a planning consultant, structural and civil engineer, arboriculturist, transport consultant, daylight and sunlight assessor, energy and sustainability consultant, and an ecologist. We assemble and coordinate that team so you have one point of contact.

Typical programme

StageTime
Feasibility study1–3 weeks
Survey and concept design2–4 weeks
Pre-application advice from the council4–8 weeks
Planning decision — minor application8 weeks
Planning decision — major application13 weeks, or longer by agreement
Technical design and tender package6–12 weeks

Included as standard

What you get

  • Site appraisal and planning policy review
  • Feasibility study with indicative unit schedule
  • Measured and topographical survey coordination
  • Concept and developed design
  • Accommodation schedule and area calculations
  • Pre-application submission and meeting with the council
  • Full planning application, drawings and statements
  • Consultant team assembly and coordination
  • Negotiation of planning conditions and Section 106 terms
  • Discharge of pre-commencement conditions
  • Technical design and building regulations package
  • Tender documentation and contractor queries

Questions

Common questions

Can you tell me how many units a site will take before I buy it?
That is exactly what a feasibility study is for. We test the site against local policy, space standards and daylight constraints and give you a realistic unit count, not a best case.
What is the Class MA prior approval route?
It allows certain commercial, business and service premises to change to residential use without a full planning application, subject to prior approval on matters such as flooding, noise, contamination and natural light. There are qualifying conditions on vacancy period and floorspace, and Article 4 directions remove it in parts of central London.
Do I need pre-application advice?
For anything beyond a couple of units it is usually money well spent. It surfaces the officer's objections while the design can still change, rather than after you have paid the application fee.
What is biodiversity net gain?
Most developments must now deliver at least a 10% measurable improvement in biodiversity, on site where possible. It affects the layout, so it needs to be designed in from the start rather than added at the end.
Do you handle HMO applications?
Yes, including change of use and the room sizes, amenity and fire separation the council and the licensing team will expect. Many boroughs have Article 4 directions removing the permitted change from a house to a small HMO, so an application is required.
Will you manage the other consultants?
Yes. We assemble the team, coordinate their outputs into the submission and remain your single point of contact throughout.

Free 20-minute consultation

Ready to see your drawings?

Send us the address and a sentence about what you want to build. We will come back with a fixed fee, a programme and the planning route we would take.

Email us Get a quote