Drawings back in 24–72 hours. Measured survey to a full set of existing and proposed drawings — 24–48 hours for a loft or extension, up to 72 hours for larger or more complex schemes.
Start your projectFree consultation
Twenty minutes on the phone or a video call. Tell us the address and what you want to do. We will tell you straight away whether it is likely to be permitted development or a full application, what the main obstacles are, and roughly what it will cost. If we think it will not work, we will say so.
Same or next working dayFee proposal
A written fixed fee with a defined scope, a programme, and a clear list of what is and is not included — third-party costs like the council's application fee, structural engineering and surveys are all set out separately so there are no surprises.
Within 24 hours of the consultationMeasured survey
We visit and laser-measure the property: room dimensions, ceiling heights, window positions, levels, drainage, boundaries and anything on neighbouring properties that will affect the design. Everything we draw is based on this, not on your existing plans.
3–5 days from instruction, typically 2–3 hours on siteDrawings
Existing and proposed floor plans, elevations and sections, plus OS-based site and location plans at the scales your council requires. You get the set to review, and two rounds of revisions are included as standard.
24–48 hours for a loft or extension · up to 72 hours for larger or more complex schemesPlanning submission
We prepare any statements the borough requires, complete the forms and ownership certificates, check everything against the local validation list, submit through the Planning Portal and pay the fee on your behalf. Then we handle the case officer, the neighbour consultation and any amendments needed to secure approval.
8 weeks for most householder and minor applications · 13 weeks for majorsBuilding regulations & technical design
Construction drawings, a written specification, structural coordination and thermal calculations, submitted to your building control body. This is the set your builder prices and works from, and it is where a well-detailed job saves money on site.
2–4 weeksTender & on site
Optional, and worth it on larger jobs. We put the package out to three or four contractors so you can compare like for like, review the returns with you, then inspect at key stages, answer builder queries, value the work and sign off at practical completion.
Duration of the buildThe 24–72 hour promise
Why we can turn drawings round in days
Because the survey is done properly, the drawing standards are set, and the team is big enough that your job does not sit in a queue behind someone else's.
A standard loft or single-storey extension goes from survey to a complete existing-and-proposed set in 24 to 48 hours. Wrap-arounds, two-storey work, flat conversions and commercial layouts take up to 72 hours. Large residential and high-rise schemes are programmed separately — we will tell you the real date at the fee stage rather than promise something that cannot be met.
What we will not do is rush a survey. Getting the existing building wrong is the most expensive mistake in this business, and it always surfaces on site when it is too late to fix cheaply.
Turnaround by project type
| Loft conversion | 24–48h |
| Single-storey extension | 24–48h |
| Wrap-around / two-storey | 48–72h |
| Flat conversion | 48–72h |
| Commercial fit-out | 48–72h |
| New build & high-rise | Programmed |
Turnaround runs from the completed measured survey, on working days.
Fees
How we charge
Householder work — lofts, extensions, garage conversions — is quoted as a fixed fee, stage by stage, so you can stop after planning if you want to. You will know the number before you commit.
Residential development, commercial and high-rise work is quoted either as a fixed fee against a defined scope or as a percentage of construction cost, depending on how well defined the brief is at the outset.
Costs that are not ours
- The council's planning application fee
- Building control fees
- Structural engineer's calculations
- Topographical, drainage or asbestos surveys where needed
- Party wall surveyor's fees and award
- Specialist reports on a borough's validation list — daylight, arboricultural, transport, flood risk, ecology, noise
- Community Infrastructure Levy, where payable
We set all of these out in the fee proposal with an estimate against each, so the total picture is visible from day one.